Goerz-Hub

The site is situated in the south west of Berlin. The existing modernist industrial building was built in several phases between 1920 and 30. For refurbishment we are adding new floors on top of the existing in a mixed wood-concrete structure. The architecture promotes a conglomerate of different materials in order to express the building history.

Project Info
Under construction
Surface
60.000 m²
Location
Berlin
Year
2019-
LP
1-9
Design Team
Simone Martini
Antonio Seghini
Maria Vittoria Monaco
Irene D`Alessandro
Joseba Iztueta